Saturday, April 26, 2014

Construction of the hotel Antonie town gained Frýdlant new architectural landmark, but very sensiti


Construction of the hotel Antonie town gained Frýdlant new architectural landmark, but very sensitively fits into the surroundings. Visit our through this exceptional building of ...
At present, the conditions for young athletes and the general lack of new objects not arise. Therefore, it is rare and admirable that the city Hradec Králové in similar events released.
The house is designed for partners ekupi with grown children who want to stand up for themselves atypical, yet low-energy house. Bent several times growing pent roof and a ...
[12 September ekupi 2011] Within a month and a half grown in Modřice u Brna container one-kindergarten for 20 children. The building is located on land next to the existing building investor five-class nursery school. Both buildings are structurally and operationally linked. The supplier of the whole building was KOMA modular construction of Vizovic. Prefabricated buildings are designed from seven large-scale container modules, which are mounted on a prepared concrete footings. Individual modules were delivered kompletizované, interconnection installation was done to build the entire building. Each module ekupi is designed ekupi and evaluated as a separate element of self-supporting steel frame, steel frame is welded from ohraňovaných galvanized profiles. ekupi The primary container roof is flat, corrugated galvanized sheet, walkable and ventilated. For security reasons, smooth ekupi water runoff was the primary flat roof of a secondary pitch roof made of wooden beams, planks, steel anchor profiles and cladding sheets with a gradient of 3%. Roof coverings are mPVC film. The outer shell is made of modules profiled galvanized sheets Asked vertically, painted on the desired RAL color. Fills holes were designed out of plastic profiles in white and clear insulating glass unit. The interior walls and ceiling are lined with plasterboard and ceramic tiles. Floors are coating (PVC). Interior doors are wooden (CPL), mounted in steel frames. The building has been newly connected to existing utilities, which are located on the property investor. It was made for water, sewer and AC supply. The building is heated by an electric hot-water boiler with radiators. TUV is prepared in a stationary electric boiler. The building has a separate measurement of energy. Rainwater from the roof is infiltration of the property ekupi investor. The layout From the entrance hall there is access to the locker room for the kids and hot meals. It is also from here leads into the utility room where the boiler is located electrical distribution box with a meter. In the dressing room for children are designed wooden benches with storage space for storing shoes and slippers. ekupi Above the benches are placed ekupi wooden ekupi hangers and shelves for postponing children's clothing. Hot meals is equipped ekupi with a kitchen with cabinets for dishes and refrigerator. The console is equipped with a stainless steel sink with mixer contactless battery and draining area. The sink trap is supplied technology cuisine. ekupi The room is lined with a height of 2 meters of ceramic tiles, the floor is covered with ceramic tiles with a coefficient of friction min. R 10th On the wall is located touchless wash basin with mixer battery for rinsing hands. Food - 22 lunches and 20 snacks - comes from the kitchen of the existing building kindergartens in thermoports transported in closed ekupi gastrovozíku. Dispensing provides one cookbook that food imports, will issue a serving window, wash dirty dishes by deferring to the carriage ekupi in the playroom and Thermo take back to the washroom to wash thermoports, located on the ground floor of the existing ekupi catering operation. Out of the closet, access to the poker room, washrooms and children into the locker room with sanitary ekupi facilities for staff. Washroom and toilet for children is equipped with four sinks, four toilets and one shower. They are designed ceramic bathroom fixtures white domestic production. Shells for children are provided with an outlet valve on the premixed water that is mixed using a thermostatic valve. The room is lined with a height of 2 meters of ceramic tiles, the floor is covered with ceramic tiles with a coefficient of friction min. R 10th in the axis of the room is placed a low wooden partition with hangers for towels. The storage area for cups with equipment for cleaning teeth over the sink consists of a wooden board anchoring to drywall installation in pre. The fixed window is used for visual contact with children, governesses in the washroom. ekupi Dressing for staff is accessible through a hall for sanitary facilities. In the dressing room there is a wardrobe, a table and two chairs. Walk in closet used to disguise also cook. Hygienic room for staff includes a combined toilet, washbasin and sink, which is structurally separate from the toilet paravent low wall. The children's playroom is illuminated from the east and west sides. On the south side are positioned built-in cabinets for storage of linen (exhaust

No comments:

Post a Comment